Return to Home Page  
2721 West State Route 161 Columbus, Ohio 43235  
Register Online for our 2008 Seminars!


Concrete Wallstone Installation Instructions: Step 1

Concrete Wallstones

 

As with pavers, base preparation is the most vital part of the installation process. Begin laying out the trench with a string line. Dig a trench 6” to 12” deep and about 4” wider than the width of the style of blocks you intend to use. If your property slopes, step the trench up or down allowing for at least half the height of a block to buried. This saves time and material.
Unilock Installation Video
Wallstone Technical Guide (PDF)

 Need a Referral?
Click Here for Contractor Connect
 Firewood Information
 

Enter your e-mail address to receive special offers and promotions:

HOME | STORE POLICIES | EMPLOYMENT | FORMS | CONTACT US | CONTRACTORS | FUNDRAISING | MEDIA

Copyright © 2008, Mr. Mulch, Inc. • All Rights Reserved. • Contact Our Webmaster